Description of Work: This theater was severely damaged by a storm that passed through town. Not only was the roofing damaged, but the movie sign was damaged as well. Many of the shingles on the front of the building were blown off and the damaged sign landed on the roof, which caused multiple cuts to the roofing membrane. Our guys fixed up the flat roof membrane and fabricated new standing seam metal to be used on site.